Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13629487

- Product Categories
- Friendly Links
Information Name: | Epoxy adhesives manufacturers - manufacturers of plastic injection anchorage price |
Published: | 2015-01-16 |
Validity: | 30 |
Specifications: | 360 g |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Epoxy adhesives manufacturers - manufacturers of plastic injection anchorage price otlbj.bmlink.com Tel: 15810424883 Yang same quality we dare than price, the same price we dare than quality, the main products; high-strength non-shrink grout material, epoxy grout, epoxy repair mortar kinds of waterproof mortar, quick-setting asphalt waterproofing spray paint. A "sticky fiber reinforced plastic, anchorage glue, glue seam sealing, grouting resin, carbon fiber plastic and other" gravity mortar, cementitious capillary crystalline waterproofing coating, polymer reinforced mortar, water reducer, accelerator, polymer repair mortar, mortar, etc. All of our products are recognized this MCC testing. Achieve ISO9001-ISO2002 international quality system certification standards, but I have a professional technical staff free of charge for customers to solve all engineering problems, and other problems. Product Description epoxy adhesive construction process: drill hole cleaning → → → dispensing with plastic → anchorage → curing → Quality Inspection anchorage glue Instructions 1. With plastic: plastic structures now MT A, B groups After the parts separately, stir, and then follow the Part A: B = 2: 1 (weight ratio), mixing evenly, can be used. 2. of Anchor: After the steel surface and holes Zairu part clean and dry, glue and reinforced Zairu part in the hole into the right amount of glue into the hole within the steel can. 3. Cure: This product suitable for use in the construction environment below 60 ℃, the initial setting time of 2 to 6 hours at room temperature. One day completely cured at room temperature, negative temperature, humid environment can also curing, curing time be extended. Construction adhesive anchorage points must be clean hole with water or dust will affect the anchoring quality. Determine a reasonable anchoring parameters, such as hole diameter and depth. Not fully cured before the ban hit moving bars. Do not use glue before anchorage A, B material mixed, immediately after mixing into the hole. Anchorage glue Note: (1) the temperature is low, to A and B were heated at 60-80 ℃ pot (bpd) in the temperature of, in order to reduce its viscosity. (2) A and B were to be made separately by the container, first take two copies of Part A into the prepared container, and then take a copy placed in Part B, and mix well. Anchorage plastic packaging, storage 1. The product packaging specifications: two-component (30 kg +10 kg / group; 15 kg +5 kg / group) 2. This product is sealed and stored in a cool, dry and ventilated environment, life at least up to 12 months typical engineering applications Beijing Third, Fourth major subject overpass anchorage reinforcement works. otlbj.bmlink.com/ League Central anchorage site grouting Beijing city buildings subject expansion anchorage http://www.gjlpf.com/ |
Admin>>>
You are the 6124 visitor
Copyright © GuangDong ICP No. 10089450, Beijing New Building Materials Co., benefits Century All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6124 visitor
Copyright © GuangDong ICP No. 10089450, Beijing New Building Materials Co., benefits Century All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility